Arcadis Ost I Offshore Substation
Customer: Bladt Industries A/S
End customer: Parkwind Ost GmbH
Location: The German part of the Baltic Sea
Period: 2020-2023
Topside weight: 2200 tons
Capacity:  247 MW
Scope comprising a full electrical engineering, procurement, construction and installation (EPCI) contract covering the substation for the Arcadis Ost offshore wind farm. The project involves all electrical disciplines including low-voltage, medium-voltage and high-voltage systems except HV GIS and HV shunts.
Competences and systems
- Main transformer and MV GIS systems
 
- Low-voltage systems
 
- Diesel generator systems
 
- Protection and control systems
 
- Project management
 
- Drainage and waste systems
 
- HVAC systems
 
- Communication and IT systems
 
- Platform identification systems
 
- Transport/spacing
 
Highlights
- Cooperation with 50 Hertz Transmission GmbH – a German transmission system operator (TSO)
 
See time lapse video of the entire construction and installation process below here: