Wind turbine upgrade, rope access
Customer: Suzlon Blade Science Center Location: Channing, Texas, USPeriod: 2018
 Semco Maritime helped with the concept design, installed the slats in a remote Texas location, decommissioned the slats after the trail was finished, and repaired the blades, returning the turbine to its original condition
Competences and systems
- Multi-skilled IRATA rope access team
 
- OSHA certified
 
- GWO certified
 
- Siemens Blade B certified
 
Highlights
- Design of shipping transport system
 
- Design of slat positioning template
 
- Design and installation of rigging system
 
- The world’s first installation of blade slats without any accidents
 
- Extreme weather conditions locally (40 degrees in the summer and snow in the autumn)