Bligh Bank 2
Offshore Substation

A full electrical engineering, procurement, construction and installation (EPCI) contract for the construction and installation of substation for the Nobelwind offshore wind farm. The project involved all electrical disciplines including low-, medium- and high-voltage systems.

Customer: Bladt Industries
End Customer: Parkwind
Location: Belgian North Sea
Period: 2016
Topside weight: 962 tonsCapacity: 165 MW


Watch the time lapse below to see Bligh Bank leave Bladt Industries' site in Aalborg.

Competences and systems:
  • High- and medium-voltage systems
  • Low-voltage systems
  • Diesel generator systems
  • Protection and control systems
  • Project management
  • Drainage and waste systems
  • HVAC systems
  • Communication and IT systems
  • Platform identification systems
  • Transport/spacing
Highlights
  • No punch work before sail-away
  • The project was delivered on time