Coral Topside Deluge Skids
Customer: TechnipFMC France
End customer: EniLocation: Singapore
Period: 2018 - 2019
 
Engineering and fabrication of 17 deluge skids for Coral FLNG. Package consisting of 3 foam/water multivalves, 4 firewater multivalves, 3 foam/water valves and 7 firewater valve deluge skids.
Competences and systems
- 7 multizone open frame deluge skids and instrument panel
 - 10 single-zone open frame deluge skids and instrument panel
 - Materials supplied from factories certified by Lloyds
 - Comprehensive NoBo requirements for materials and documentation
 
Highlights
- Customised design
 - Focus on Human Factors Engineering
 - The project was carried out based on the global setup of Semco Maritime