Floatel Victory – Modifications and 5-yearly SPS
Customer: Floatel International AB
Location: Hanøytangen, Bergen, Norway
Period: 2018
 
The Floatel Victory accommodation rig was dry docked at our facilities in Hanøytangen, Norway, for about 3 months to undergo a 5-yearly special periodic survey (SPS) and various modifications prior to contract work for Maersk Oil in the UK sector of the North Sea.
Competences and systems
- 5-yearly SPS
 - Underwater removal of thrusters and assisting with thruster overhaul
 - Fixing noise and vibration issues
 - Replacing potable water piping
 - Installation of instrument piping and valve actuators
 - Installation of water mist system
 - Extensive flooring and living quarters repair including replacement of doors
 - Replacement of utility hoses
 - Hull and anode inspection
 - Extensive HVAC upgrade
 - Replacement of 2 HV switchboards and breakers
 - Installation of helideck lighting
 
Highlights
- Some of the project scopes were carried out offshore - while the rig was mobilising for Hanøytangen - in order to reduce dock time
 - Approximately 150 people were involved in the upgrading work
 - The Hanøytangen camp area hosted the project staff involved