Maersk Inspirer – Preparation for Redeployment
Customer: Aker Solutions
End customer: Mærsk DrillingLocation: Port of Grenaa, Denmark
Period: 2018
The project scope included preparation of the Maersk Inspirer rig for redeployment to the Yme field on the Norwegian Continental Shelf.
Competences and systems
- Corrosion repair and application of antifouling coating on all three rig legs (approx. 1.500 m2 per leg)
- Inspection and repair of firewater line and flare tower
- Installation of new anodes, bolts and nuts (approx. 1,000 pcs. from bay 11 – 19; bay 19 being 95 metres above jacking structure) on guides for firewater riser and dump line
Highlights
- Semco Maritime erected a total of 390 tons of scaffolding around all three rig legs prior to commencing work
- The project was delivered on time
- Positive feedback from end customer