Princess Amalia
Offshore Substation

Customer: Bladt IndustriesEnd customer: EnecoLocation: The Dutch part of the North SeaPeriod: 2006 - 2007Topside Weight: 650 tonsCapacity: 120 MW


Full electrical engineering, procurement, construction and installation (EPCI) contract for the construction and installation of substation for the Princess Amalia offshore wind farm. The project involved several electrical disciplines including low-voltage systems.

Competences and systems
  • Low-voltage systems
  • Cableways and cable pulling
  • HVAC systems
  • Firefighting systems
  • Fire detection systems
  • Communication systems
  • Diesel power generation
  • Project management
Highlights
  • The project was performed on time
  • Positive feedback from customer