Rødsand 2
Offshore Substation
Customer: Bladt IndustriesEnd customer: EnerginetLocation: The Danish part of the North Sea Period: 2008 - 2010Topside weight: 1200 tonsCapacity: 207 MW
The scope included a full engineering, procurement, construction and installation (EPCI) contract for the offshore substation. The project consisted of several electrical disciplines including low-voltage systems.
Competences and systems
- Low-voltage systems
- Cableways and cable pulling
- HVAC systems
- Firefighting systems
- Fire detection systems
- Communication and IT systems
- Diesel power
- Project management
Highlights
- Energinet´s first offshore wind farm
- Placed on gravity foundation
- Project delivered on time with positive feedback from customer